Judy / Joanne Platform

Conoco Philips (1992)

40 year design life

The Judy Joanne Platform commenced fabrication in 1994. The Platform was fabricated in the AMEC yard on the Tyne River near Newcastle.

To solve the problem of potential corrosion around the Caissons polyurethane was used to provide anti-corrosion protection by Conoco Phillips.

Heavy Lift Vessel M7000 lifting Platform onto Jacket.